Planning Renovation, Installation, or Technical Work?
At Bali Building Solutions (BBS), we provide on-site construction and renovation services with clear scope, fair pricing, and full transparency.
We do not provide free quotations for this type of work. All projects are assessed through a paid site survey to ensure pricing is accurate, professional, and fair for both parties.
How We Decide Pricing
Every project is different.
We group jobs by size and how clear the scope is, and this decides how the job should be priced.
Project Type 1 — Handyman & Maintenance Works
(Usually under Rp 10 million)
Small jobs such as repairs and minor installations.
These jobs are short and often change once work starts.
Pricing: Cost-Plus
You pay for:
- Labour per day or task
- Materials at cost + margin
- Construction equipment hire
- Transport and logistics
Project Type 2 — Small Works & Upgrades
(Around Rp 10 – 50 million)
Jobs that take several days, such as:
- Bathrooms
- Kitchens
- Partial renovations
Pricing: Cost-Plus
You pay for:
- Labour per day
- Materials at cost + margin,
- Construction equipment hire
- Transport and logistics
Project Type 3 — Defined Renovation Works
(Around Rp 50 – 150 million ++)
Larger renovations where the scope becomes clear after a site visit.
Pricing: Cost-Plus and fixed labor prices for Specialist Workers
You pay for:
- Basic or Skilled level worker (eg Helper, Mason, Carpenter, Steel Fixer, Tiler, Painter)
- Specialist Worker (eg Electrician, Plumber, Weilder, Stone Installer, AC technician, Cabinet Maker)
- Site Supervisor and or Project Management
- Construction equipment hire
- Transport and logistics
Project Type 4 - Construction Projects
(Usually above Rp 150 million)
Large renovations or construction works that need clear structure and budget control.
Pricing: Lump Sum / BOQ-based pricing
Prices are linked to construction drawings and progress payments.
Why a Site Survey Is Needed
Correct pricing depends on understanding:
- Actual site conditions
- Access and logistics
- Limits to the scope
- Workmanship and risk
The site survey allows us to:
- Confirm measurements and scope
- Place the project in the correct tier
- Identify risks early
- Choose the right pricing method
The site survey deposit is not lost.
It is credited toward your project or materials purchased from BBS.
How Costs Are Shown
All pricing is broken down clearly:
- Materials – supplied by BBS shown transparently through www.balibuildingsolutions.com
- Labour – daily or specialist labour
- Vehicles, Equipment & tools – charged only if needed
- Management & coordination – included only when the job size and risk require it
Next Step
To get started, send:
- Your location, and
- A short video of what you want done
to WhatsApp 0811-3960-6578
Our team will then confirm:
- If the job can be scheduled
- Which project tier it falls under
- The site survey deposit
- The best pricing method for your job
Bali Building Solutions (BBS)
Fair pricing. Clear scope. On-site construction support you can trust.